Slate Roofing Hayling Island
Slate Roofing services in Hayling Island
A slate roof is stripped and reinstated as a whole. Most of the slate removed from a Hayling Island roof is reinstated on the same slope. The battens, the underlay, the fixings and the lead beneath the covering therefore account for most of the price. Slate on Hayling Island is confined to the older cottages around the original settlements at Northney and North Hayling. Those cottages stand among the bungalows and chalets raised across the island from the 1950s onwards, all of which were built in tile.
A director conducts your survey and establishes what proportion of the original slate remains serviceable. We respond within 48 hours. Your written, itemised quotation follows within 48 hours of that survey, naming the retained slate, the new slate, the battens, the underlay and the lead, with no hidden extras. The team carries £5 million in public liability insurance and a 5-star rating, and over 15 years of combined hands-on experience stands behind the installation.

What do Hayling Island homeowners want settled before a slate roof is priced?
The older cottages around the island’s original settlements are the Hayling Island properties built in slate. A re-slate there renews the fixings, the battens and the underlay beneath slate that remains sound. Homeowners on Hayling Island ask us to settle the following before the work is priced:
A choice between staying with slate and moving to tile
A slate roof carries its covering for a generation, so a director settles the choice at the survey. Slate keeps the thin profile and the shadow lines the elevation was built with, and tile roofing changes both. We price both materials for the same roof, so you decide on the quotation.
A director confirms what the rafters of an island cottage will carry, then prices the slate and the tile for that roof.
Refixing that has become routine
Where we are refixing slates season after season, the fixings have reached the end of their service life and the slate has not. Refixing remains appropriate until enough of the elevation is loose that returning costs more than renewing. A director confirms whether the roof needs a roof replacement instead.
The prevailing south-westerly wind off open water loads the windward slopes of the older cottages at Northney and North Hayling, and we are called back to those slopes most often.
What is renewed underneath while the slope is open
Battens and roof underlay sit under the slate and reach the end of their service life first. We renew both while the slope is open, because reaching them later means lifting the slate a second time. The quotation names each of them.
On an island cottage the battens were laid straight onto the rafters, with no underlay above them. A director measures the whole slope for underlay at the survey.
Gutters, fascias and the eaves course together
We work the eaves course, the fascia and the gutter line from the same scaffold, and the eaves is where a slate roof is most often disturbed. Renewing them in one visit avoids a second visit to the same run, and the quotation prices each item separately.
The slate at the eaves cannot be re-hung over a decayed fascia. A director records the fascia and the gutter condition on the island’s older cottages at the same survey.
A slope that has been coated, filleted or torched
Sprayed coatings, mortar fillets and torching all held ageing slate in place at one time, and each of them makes the slate beneath harder to recover. Where a slope carries one of those treatments, a director establishes at survey how much of the original covering we can still re-hang.
A coating is not always apparent from ground level, so a director inspects each cottage slope at the survey before any slate is priced.
Which Hayling Island roofs were built for slate?
Most of Hayling Island’s housing was built during the resort growth that followed the 1950s, and the bungalows, chalets and holiday homes raised then were tiled. The older cottages stand in the original settlements at Northney and North Hayling.
Those cottages carry the slate. A director measures the lead at the abutments on their seaward elevations individually, because the driven rain reaches the roof there.
Deliveries reach the island by a single road, so a director confirms vehicle access and the standing room for the stacked slate at the survey.

What does slating a Hayling Island roof involve?
Most of the slate removed from a roof returns to the slope, so the project is largely the sorting, stacking and re-hanging of the slate itself. This is how our team re-slates a Hayling Island roof, from the first survey through to the written record.
A director surveys the slate before anything is priced
The initial visit establishes which slate the elevation carries and how it was originally set out and lapped. A director additionally records the condition of the fixings, the battens and the rafters beneath. A roof inspection is the appropriate starting point where you need the existing roof assessed rather than renewed.
The quotation names the slate and what happens to the slate that comes off
Within 48 hours of the survey you receive an itemised quotation. It itemises the retained slate and the replacement slate separately, and the underlay, the battens, the lead and the ridge are priced alongside them. Labour and waste removal are listed on their own. There is no obligation and no hidden extras.
We strip the slate by hand and stack it on the scaffold
The team completes the stripping elevation by elevation and sorts the serviceable slate as it is removed, stacking it away from the working platform. The ground beneath the eaves is sheeted before anything is disturbed. The stacks stand clear of the driveway, so the household keeps the use of it throughout.
The elevation is set out before the first slate is hung
The team establishes the courses and the lap from the eaves, so the lines continue across the elevation and register correctly with the hips, the valleys, the verges and the abutments. Where the original slate returns to the slope, the setting out accommodates the sizes recovered from it.
Handover, the spare slate and the written record
The team clears the accumulated debris from the gutters and the valleys, and the surplus slate remains stacked wherever the household prefers. The record of the slate hung, and of the battens and underlay renewed beneath it, is issued with the invoice.
Why Choose Us for Slate Roofing in Hayling Island?
Over 15 years of experience working in Hayling Island
Connor and Jack bring over 15 years of combined hands-on roofing experience, delivering everything from small domestic repairs to large-scale commercial projects on Hayling Island's oldest slated cottages, including new roof installation.

Local Hayling Island knowledge
Based in Portsmouth with deep local roots, we understand Hampshire's homes, weather and building styles, including the exposed slopes and older cottages on Hayling Island, which allows us to deliver roofing work that lasts.

5-star rated service
We are proud to be rated 5 stars on Google by our customers, reflecting the quality of our workmanship and our commitment to reliable, professional service.

Competent & highly trained team
Our team is fully trained and certified in asbestos awareness, working at height and manual handling, ensuring every project is carried out safely and to industry standards.

£5 million public liability insurance
We carry up to £5 million in public liability insurance, giving you complete peace of mind that your property is fully protected while we work on Hayling Island.

10 year workmanship guarantee
All new slate roof installations come with a 10-year workmanship guarantee, so you are covered in the unlikely event of any issues.


Frequently asked questions
Take a look at the Frequently Asked Questions regarding our Slate Roofing service in Hayling Island.
Can the slates from a Hayling Island roof be used again?
Yes, for the proportion that comes off sound, which on a roof that has not been coated or filleted is most of the elevation. The team sorts the slate on the scaffolding and reinstates it on new battens and fresh underlay, elevation by elevation. The shortfall is supplied from matching stock and itemised within the quotation. A director establishes that proportion at the survey. Where a single slate has slipped and the remainder of the slope is serviceable, a roof repair is the appropriate course.
Where does the slate go while a Hayling Island roof is stripped?
Slate that is to be reinstated remains on the property, stacked clear of the working area. The remainder is removed and the surrounding ground swept at completion. A slate installation requires standing room for the stacked slate in addition to the skip. Most bungalow plots on the island have driveway space for the stacks. Around the older cottages the space is tighter, and we set the stack against the boundary to keep the frontage clear. Where neither will fit, we confirm the arrangement with you in advance of the booking.
What happens if the weather turns while a Hayling Island roof is open?
Only the slope being worked is open at any point, and the team covers it before leaving the property. We sequence the stripping elevation by elevation rather than opening the entire roof, so the property never depends on a temporary covering across every slope. Slate already stacked is unaffected by rain, and the setting out resumes from the course the team had reached.
Are there Hayling Island roofs you would not re-slate?
Yes. Where the elevation or the rafters beneath will not carry slate, a director advises against it at survey and prices tile or an alternative covering instead. The same applies where the roof was never slated. The bungalows, chalets and holiday lets that followed were specified for tile. A change of material confers no appreciable benefit on those elevations. We recommend slate where the elevation was originally built with it.
What do you need from me to quote a Hayling Island slate roof?
A telephone call or the contact form, and access to the roof on the day of the survey. A director establishes what is on the roof, how it was originally set out and what lies immediately beneath it. The written, itemised quotation follows within 48 hours of that survey. You are under no obligation to proceed with the installation. We work to the same arrangement everywhere in our Hayling Island service area.
The Hayling Island Suburbs we Provide Slate Roofing services to:
Eastoke, Ferry Point, Gable Head, Mengham, Mill Rythe, North Hayling, Northney, Sandy Point, Sinah, South Hayling, Stoke, Tournerbury, Tye, West Town.






