Wall Cladding Installation Hampshire

Wall Cladding Installation Services in Hampshire

Wall cladding gives a property a renewed appearance and a more robust layer of weather protection. When installed correctly, with a proper rainscreen build-up behind the boards, it performs reliably for decades with minimal maintenance.

C J Roofing & Renewables Ltd specialises in wall cladding installation across Hampshire. We assess the wall type, match the material to the substrate and street context, construct the full rainscreen build-up, and back every new installation with a 10-year workmanship guarantee.

Call 02393873756 for a free site visit. We respond within 48 hours.

House gable clad in dark grey horizontal wall cladding above red brick, with scaffolding and white windows.

How do you know wall cladding is right for your home?

Wall cladding suits Hampshire homes that need a fresh weather skin, better thermal performance, or a change in appearance. Each goal calls for a different material and build-up specification.

The main reasons driving most installations are as follows:

Why does a proper rainscreen build-up matter?

A proper rainscreen build-up is what keeps the wall behind your cladding dry, ventilated, and insulated. It is this layered system, rather than the boards alone, that transforms cladding into comprehensive weather protection.

We construct the system from the inside out:

  1. Original wall, repointed or repaired as necessary
  2. UV-stable facade breather membrane, taped at every overlap
  3. Treated vertical battens at 600mm centres, with insulation between where specified
  4. 25mm ventilated cavity that drains incidental moisture
  5. Boards fixed with stainless A4 ironmongery
  6. Trim detail at every corner, reveal, and edge

Omitting the cavity can lead to batten rot within five years; neglecting the breather membrane can allow rain to reach the wall behind; using non-stainless fixings on a coastal project can result in corrosion. Each layer serves a purpose, and removing one compromises the integrity of the whole system.

Roofer in black fitting grey weatherboard cladding to a dormer with a dark window, working from scaffolding on a roof.

What does our wall cladding installation process involve?

Our wall cladding installation follows five stages: survey, scaffold, prep, fit, and snag walk. Each stage is documented so you have a clear account of what was agreed and what was completed.

How long does a wall cladding installation take?

A wall cladding installation typically takes between 4 and 14 working days on a standard Hampshire home. The duration depends on the size of the elevations, the board type chosen, and the condition of the substrate.

Small porch facelifts can be completed in 2 days. A standard three-bedroom semi typically takes 4 to 10 days, and full four-elevation jobs on detached homes may extend to 10 to 14 days.

The substrate condition influences the programme significantly. Battens can be fixed to a sound brick wall within a day, whereas a deteriorated timber frame requires preliminary carpentry work, adding 2 to 3 days before the new cladding is installed.

Weather also plays a role. Our sealants and tapes require a dry substrate to cure correctly, so heavy rain or frost may delay work by a day or two.

House wall clad in dark grey horizontal weatherboard cladding with a white-framed window and black downpipe.

Why Choose C J Roofing & Renewables Ltd for Wall Cladding Installation in Hampshire?

  • Over 15 years of experience

    Connor and Jack bring over 15 years of combined hands-on roofing experience, delivering everything from small domestic repairs to large-scale commercial projects across Hampshire.

    Green line icon of a builder in a hard hat holding open a set of plans, conveying roofing experience.
  • Locally based in Hampshire

    Based in Portsmouth with deep local roots, we understand Hampshire’s homes, weather, and building styles - allowing us to deliver roofing work that’s built to last.

    Green line-drawn thumbs-up icon with small accent marks, representing customer approval and a positive review.
  • 5-star rated service

    We’re proud to be rated 5 stars on Google by our customers, reflecting the quality of our workmanship and our commitment to reliable, professional service.

    Green line icon of a person above a speech bubble containing three stars, representing a customer review.
  • Competent & highly trained team

    Our team is fully trained and certified in asbestos awareness, working at height, and manual handling - ensuring every project is carried out safely and to industry standards.

    Green line-art icon of three people beside a document with a tick, representing a roofing team.
  • £5 million public liability insurance

    We carry up to £5 million in public liability insurance, giving you complete peace of mind that your property is fully protected while we work.

    Green line icon of a document with a rosette and tick mark, representing public liability insurance cover.
  • 10 year workmanship guarantee

    All new roof installations and replacements come with a 10-year workmanship guarantee, so you’re covered in the unlikely event of any issues.

    Green line icon of an open hand holding a shield with a tick, symbolising a workmanship guarantee.
Roofer in branded workwear standing on scaffolding fixing timber battens to a pitched roof being re-tiled.

Frequently asked questions

Take a look at the Frequently Asked Questions regarding our Wall Cladding Installation service.